The four main objectives for the demonstration included assessing the repair to address the hydrogen leak identified on the previous launch attempt, loading propellants into the rocket's tanks using new procedures, conducting the kick-start bleed, and performing a pre-pressurization test.
The new cryogenic loading procedures and ground automation were designed to transition temperature and pressures slowly during tanking to reduce the likelihood of leaks that could be caused by rapid changes in temperature or pressure. After encountering the leak early in the operation, teams further reduced loading pressures to troubleshoot the issue and proceed with the demonstration test.
The pre-pressurization test enabled engineers to calibrate the settings used for conditioning the engines during the terminal count and validate timelines before launch day to reduce schedule risk during the countdown on launch day.
Teams will evaluate the data from the test, along with weather and other factors, before confirming readiness to proceed into the next launch opportunity. The rocket remains in a safe configuration as teams assess next steps.
Follow along for updates on of the Artemis I mission here
| Buy Advertising | About Us | Editorial & Other Enquiries | Privacy statement |
| The content herein, unless otherwise known to be public domain, is Copyright 1995-2026 Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principles for news reporting and research purposes. |